Cold Bonding Sandal PU Production Line Solution & Guide

Cold Bonding Sandal PU Production Line Solution | Haifeng

Cold Bonding Sandal PU Production Line Solution & Guide

This mature and cost-effective turnkey system is provided by Haifeng Polyurethane Machinery. It adopts the classic cold bonding process, producing soles separately then bonding with uppers via adhesive. Featuring flexible production, low investment and wide product compatibility, it is ideal for small-to-medium batch sandal and casual shoe manufacturers.
Cold bonding sandal finished product Beach shoe cold bonding product

Basic Project Parameters

Артикул Detailed Specification
Raw Material System Two-component PU: Polyol (A) : Isocyanate (B) = 100 : 40 ~ 70
Preheating temperature: 60 ~ 70℃ (Special drying oven required)
Auxiliary Materials Release agent, pigment, Methylene Chloride (mixing head cleaning), DOP (tank cleaning)
Casting Performance Max instantaneous flow: 70 g/s
Metering accuracy: ±0.5%
Система управления HMI manual / semi-automatic control, support multi-formula storage
Standard Color Industrial standard color
Applicable Product Beach shoes, sandals (Cold bonding process)

Core Process Advantages

The cold bonding process separates sole production and upper bonding: PU soles are molded and cured first, then bonded with pre-cut uppers via adhesive. This mature technology offers:

  • Low initial investment and flexible production scheduling
  • Compatible with various upper materials (fabric, leather, synthetic leather)
  • Easy mold replacement, suitable for multi-style small-batch production
  • Simple operation and low maintenance cost

Complete Production Process

Sequence Procedure Detailed Description Picture
1 Upper Cutting Cut raw materials into standard upper shapes Cutting machine
2 Upper Finishing Trim edges and punch holes as required Upper finishing
3 Sole Preparation Mold Preparation Sole mold
Robot Spraying Release Agent Spraying robot
PU Casting PU casting machine
Mold Closure Mold closure
Enter Curing Tunnel Curing tunnel
4 Sole Demolding Open mold and take out fully cured PU soles Sole demolding
5 Adhesive Application Apply adhesive evenly on both sole and upper bonding surfaces
Adhesive application 1 Adhesive application 2 Adhesive coating table
6 Press Bonding Align sole and upper accurately, then press firmly Bonding press
7 Final Finishing Trim excess glue, quality inspection and packaging Finishing line
Cold bonding process flow chart

Cold bonding sandal production process flow

Full Equipment List

Equipment Name Quantity Overall Size (mm) Core Parameters Picture
Hydraulic Cutting Machine 1 set Customizable Cutting force 25~100T, power 3~7.5KW Hydraulic cutting machine
CNC Pneumatic Cutting Machine 1 set Customizable Feeding accuracy ±0.1mm, power 2.2~7.5KW CNC cutting machine
Raw Material Drying Oven 1 set 1700×1360×2050 Volume 2.5m³, max temp 90℃, power 6.55KW Drying oven
Automatic Conveyor Line 1 set 19000×2000×2200 Total power 45~55KW Conveyor line
Automatic Release Agent Spraying Robot 1 set 750×750×1500 Load 7KG, power 1KW Spraying robot
Special PU Sole Casting Machine 1 set 2200×1400×2200 Max flow 70g/s, accuracy ±0.5%, power 20.55KW PU casting machine
Mold Opening & Closing Unit 2 sets 1300×1000×1000 Servo motor, power 2KW Mold opening unit
Curing Tunnel 1 set 2000×1150×1000 Stainless steel interior, power 0.55KW Curing tunnel
Air Compressor & Air Tank 1 set 1800×1000×2000 Power 22KW, exhaust 3.2m³/min Air compressor
Industrial Chiller 1 set 900×600×1100 Cooling capacity 6.02KW, power 1.91KW Industrial chiller
Release Agent & Cleaning Tank 2 sets 300×300×1000 Store release agent and cleaning solvent Storage tank
Adhesive Coating Machine / Table 1 set Customizable Manual or automatic adhesive application Coating table
Bonding Press Machine 1 set Customizable Pressing time 1~99s adjustable, power 0.2~3.75KW Bonding press
Finishing Line 1 set Customizable Edge trimming, inspection and packaging Finishing line
Edge Trimmer 1 set Customizable Finished product edge trimming Edge trimmer
Raw Material Mixer 1 set Customizable Mix PU A/B components evenly Raw material mixer

Production Capacity & Efficiency

Production Index Data Remark
Single Cycle Time 8 ~ 9 minutes per pair Including sole curing and bonding process
8-hour Shift Output 1600 ~ 1800 pairs Theoretical value
16-hour Daily Output 3200 ~ 3600 pairs Theoretical value
Actual Production Capacity 80% ~ 90% of theoretical value Affected by operator proficiency & equipment maintenance

Workshop & Operating Requirements

Артикул Standard Requirement
Workshop Space Flat floor, overall size about 25m × 8m
Ambient Condition Temperature ≤40℃, No condensation
Источник питания 3×380V ±5%, 50Hz, reliable grounding
Total installed power: about 85 KW
Compressed Air 0.7 ~ 0.8 MPa, dry & oil-free
Cooling Water Clean water, Temperature ≤15℃, Flow ≥6 m³/h
Operators 4 ~ 5 trained workers (Cutting / Coating / Bonding / Trimming)

Power & Resource Consumption

Consumption Item Параметр
Total Installed Power About 85 KW
Compressed Air Consumption 0.5 ~ 0.7 m³/min
Cooling Water Circulation 5 ~ 6 m³/h, Water temp ≤15℃

Common Defects & Troubleshooting

Defect Phenomenon Коренная причина Решение
Poor bonding strength Insufficient surface treatment / Uneven adhesive Strengthen surface roughening; Standardize adhesive application
Sole bubble defects Raw material moisture / Insufficient mixing Seal material tanks; Calibrate mixing speed
Glue overflow Excessive adhesive / Misalignment Control adhesive dosage; Align sole and upper accurately
Incomplete sole curing Low oven temperature / Short curing time Adjust heating parameters & conveyor speed

Optional Upgrades & Customization

  • Automatic adhesive spraying robot
  • Automatic upper feeding system
  • MES production data management system
  • Explosion-proof configuration for adhesive workshop
  • Voltage & frequency customization for global markets
  • Multi-station rotary bonding press

Packaging & Transportation

  • Overall Volume: Fit into 1 × 40GP container
  • Total Weight: 8 ~ 12 tons
  • Export Package: Rainproof film + Wooden pallet / Iron frame, comply with international sea transportation standards
  • Production Lead Time: 25 ~ 30 working days after deposit

After-Sales Service

  1. Provide complete technical documents: Operation manual, electrical drawings, workshop layout drawings.
  2. Overseas engineer on-site installation, commissioning and operator training (Buyer bears relevant fees).
  3. Warranty period: 12 months from delivery date, free spare parts for non-artificial quality problems.
  4. Lifetime technical guidance and spare parts supply after warranty.

Часто задаваемые вопросы

What is the difference between cold bonding and one-piece molding process?
Cold bonding has lower investment and is more suitable for multi-style small-batch production; one-piece molding offers higher strength and faster production speed.
Can this line produce different sizes and styles of sandals?
Yes, just replace the sole molds and adjust the formula parameters.
Is the equipment voltage adjustable for different countries?
We support voltage and frequency customization for global markets.
What is the main daily maintenance work?
Clean mixing head and adhesive nozzles daily; Check temperature and pressure per shift.
Can we upgrade the line to increase production capacity later?
Yes, we provide modular upgrade solutions to meet your growing demand.

Get Custom Cold Bonding Sandal Production Line Solution

Free workshop layout design, technical consultation and equipment quotation available.

Free Consult
Электронная почта info@haifeng-automation.cn
Официальный сайт www.haifengmachine.com
WhatsApp +86 13566296633
© 2026 Haifeng Polyurethane Machinery. Все права защищены.

СОПУТСТВУЮЩИЕ ТОВАРЫ

ПОСЛЕДНИЕ НОВОСТИ

CONTACT US

Чтобы узнать больше о наших продуктах и решениях, заполните форму ниже, и один из наших специалистов свяжется с вами в ближайшее время.