A low-pressure PU machine is sized from two documents, not from a machine brochure. The material TDS fixes the window your pumps and mixing head have to survive: viscosity at process temperature, density at that same temperature, the basis of the mix ratio, reactivity, and filler load. The SOP fixes what the plant asks the machine to do every shift: shot weight, cycle, changeover frequency, cleaning discipline, and how stable the utilities really are. When both arrive in measurable form, the machine can be specified in one pass. When either is missing, the supplier fills the gap with an assumption, and that assumption usually surfaces as a ratio that drifts at the end of a long run.

Why the mix ratio on the TDS is not the ratio you set

Most TDS sheets state the mix ratio in parts by weight. A low-pressure machine meters by volume, through pump displacement or a set stroke. The two figures are not interchangeable, and the conversion needs a density taken at the temperature the material actually reaches at the pump.

The conversion is:

Volume ratio A : B = (W_A ÷ ρ_A) : (W_B ÷ ρ_B)

where W is the parts by weight from the TDS and ρ is the density of that component at process temperature.

Take a TDS that states 100 : 45 by weight. At process temperature the polyol reads 1.02 g/cm³ and the isocyanate reads 1.22 g/cm³. The polyol volume is 100 ÷ 1.02 = 98.0. The isocyanate volume is 45 ÷ 1.22 = 36.9. The volume ratio is 98.0 : 36.9, or roughly 2.66 : 1. Enter 2.22 : 1 instead, which is the weight ratio used as though it were a volume ratio, and the isocyanate stream runs at about 31 percent of total volume where the formula calls for about 27 percent. The arithmetic takes a minute. The consequence is a part that is over-indexed from the first shot, and a fault that will be blamed on the material.

a1

Density at 25 °C is not density at process temperature. Heating a polyol lowers its density, so a room-temperature figure overstates the mass delivered by a fixed pump stroke. Filled systems add a second trap: the density printed on the TDS may describe the base resin, while the material in the tank carries filler that changes both density and viscosity. Ask which one the figure refers to.

What to ask when the TDS gives a single ratio figure

Four questions settle most of it. Is the ratio by weight or by volume? At what temperature were the densities taken? Does the figure include filler? And is there an acceptable band around it?

The fourth question matters more than buyers expect. Many systems are specified with an isocyanate index window rather than one fixed number. If a window exists, the machine has to hold ratio inside it across a shift, not merely average the right value. A machine that averages correctly while swinging either side of the target can still push parts outside the window, and the parts that fail will not be evenly distributed through the shift.

What a material TDS must state before the machine can be sized

Six fields do most of the work. If any of them is missing, the supplier is sizing from assumption rather than data.

TDS field Why the machine needs it What an incomplete entry looks like
Viscosity at process temperature, with method and shear rate Sets pump type, suction line diameter and required inlet pressure A single figure at room temperature with no method, where spindle and capillary methods disagree on shear-thinning material
Density at process temperature Converts the weight ratio into the volume the pumps deliver Ambient density only, or base-resin density with no filler correction
Mix ratio with its basis and tolerance Sizes both pump ranges and exposes the small-stream minimum A bare “1:1” with no statement of weight, volume or temperature
NCO content or hydroxyl value Gives an analytical check on the ratio and on incoming lots A ratio with nothing to verify it against
Filler type, loading and particle size Drives wear parts, agitation design and valve clearance The phrase “filled system” standing alone
Moisture limit and storage instruction Explains bubble risk and whether the day tank needs stirring or blanketing No water limit and no statement on settling

Two further fields are often left out and often matter. The first is the processing temperature window for each component separately, since isocyanate viscosity responds strongly to temperature and the pump inlet is where that shows up. The second is the additive or color stream with its own ratio. A third stream makes the machine a 3K system, which changes pump count rather than merely adding a recipe line.

A third stream changes hardware, not just recipe memory, and that question sits inside the wider one of which equipment family suits the plant. <Polyurethane Machinery 101: A Comprehensive Guide to Equipment Types and Engineering Selection> covers how machine types are classified and where the selection criteria shift between them.

From TDS values to pump and mixing-head choices

Viscosity picks the pump family. Gear pumps deliver smooth, nearly pulseless flow and suit low to medium viscosity systems, including many filled ones. Piston pumps give reliable positive displacement but produce a pulse on every stroke, which becomes visible when the shot is small. Screw pumps handle high viscosity at low flow with less shear, at a higher cost and with a harder cleaning routine between colors. The figure that governs the choice is not the headline viscosity on the TDS but the viscosity at the lowest temperature the material will see at the pump inlet, on the coldest morning of the year.

The pump family settles only part of the decision, because the same product can often be poured on either machine class. <High Pressure vs. Low Pressure Polyurethane Foam Machine: How to Choose the Right One for Your Production> covers the comparison between the two classes and the production conditions that separate them.

Ratio spread asks a different question. A 100 : 8 formulation is not a harder version of 100 : 100; it is a separate sizing problem, because the small stream falls to a few grams per shot. Ask for the minimum continuous output of the B stream at stable ratio, not the minimum total output of the machine. A supplier can quote an impressively low total minimum by slowing both streams together, which changes mixing quality at exactly the point where mixing is hardest.

Filler content decides wear and settling. Abrasive filler wears gear pump faces, seals and valve seats, and the wear shows up first as ratio drift rather than as a visible failure. Settling filler needs agitation in the day tank and recirculation during pauses. Particle size sets clearance in the mixing head and in the check valves, so a head that mixes a five-micron filler cleanly may block on a fifty-micron one.

Reactivity sets the time budget. A short gel time shortens the dwell the material can tolerate in the mixing chamber and in the transfer line, which fixes flush interval and chamber volume. A long gel time is not automatically easier to run, because it usually means more molds on the line to keep the machine occupied.

On our LJJ series low-pressure machines, metering accuracy is quoted at ±0.5%. That figure describes how closely the pump delivers the set ratio at the moment of measurement. It says nothing about how far the ratio moves across an eight-hour run unless a repeatability figure is quoted beside it, and repeatability is the number that decides whether an index window survives a full shift.

What only your SOP can tell the supplier

The TDS describes the material. The SOP describes demand, and demand is where most sizing errors start.

SOP field What it changes in the specification
Average and peak shot weight Pump size and stroke resolution, because small shots punish oversized pumps
Shots per hour at average, with the peak hour noted separately Continuous rating rather than a nameplate maximum
Cycle time and number of mold stations Mixing head travel, carriage or robot requirement, buffer logic
Changeovers and color changes per shift Flush design, solvent consumption and the waste each change produces
Cleaning method you will actually allow Mixing head type, drain and waste handling, and whether automatic cleaning earns its cost
Measured air, water and power conditions at the machine location Alarms, interlocks, buffer tanks and whether a chiller is needed

a9

The average and the peak are separate numbers and both are needed. A machine that covers the peak hour by design runs below capacity for the rest of the shift. A machine sized on the average cannot cover the peak at all, and the shortfall appears as longer cycles, higher temperatures in the mixing head, or operators skipping the flush to save time.

Why the average hour hides the shortfall

Utilization belongs in the same conversation. If the line delivers six productive hours inside an eight-hour shift, the hourly rate has to be calculated on the six. Quoting a rate based on the eight produces a machine that is undersized in exactly the weeks when the plant is busy.

Nameplate maximum and continuous rating are also different claims. A maximum output figure usually describes a short interval under favorable conditions. Ask for the output the machine holds across a full shift with the specified material at the specified ratio, and treat the difference between the two figures as a design margin you have not yet measured.

Turning a vague requirement into a measurable RFQ line

Reject this RFQ line:

“We need a low-pressure PU foaming machine for our sole line, around 200 pairs per hour, please send your price.”

Replace it with:

“Polyester PU sole system, TDS attached. Mix ratio [ ] by weight at [ ] °C. Viscosity [ ] mPa·s at [ ] °C by [ ] method. Densities [ ] and [ ] g/cm³ at [ ] °C. Cream time [ ] s and gel time [ ] s at a [ ] g shot. Shot weight [ ] g, [ ] shots per minute, [ ] productive hours per shift. Filler [ ] percent at [ ] µm. Color changes [ ] per shift. Measured plant air [ ] MPa, cooling water [ ] °C.”

a13

Every bracket is a field the supplier would otherwise assume, and every bracket is also an acceptance criterion. Whatever number you write into the RFQ is what you can test at factory acceptance, which converts a vague promise about quality into a measurement with a pass line.

What the data cannot prove

Each of the documents above supports a narrower claim than buyers usually attach to it. That is not a reason to distrust the data. It is a reason to state the boundary before the purchase order.

Evidence Conditions it was produced under What it can support What it cannot
A TDS viscosity figure One method, one temperature, one lot Pump and line sizing for that method and that temperature Inlet behavior at a colder temperature or on a later lot
A one-day trial on your material One lot, one formulation, one set of checks Whether the machine runs that lot within the checks performed Lot-to-lot variation, seasonal viscosity shifts, or a second formulation
Supplier factory acceptance test Supplier utilities and supplier water Machine function and metering repeatability under stable conditions Your plant’s utility stability and your operators’ cleaning discipline
A nameplate maximum output Short interval, favorable conditions A ceiling for the mechanical design A continuous eight-hour rating

The boundary sentence matters in negotiation as much as in engineering. A trial that produced good parts on one lot proves that the machine and that lot can work together. It does not prove that next month’s lot will behave the same way, because viscosity and reactivity move between batches. If the purchase depends on a second formulation, the trial has to include it.

A pre-selection checklist you can run this week

  1. Request the six TDS fields in writing, naming the temperature and the test method for viscosity and density rather than accepting whatever the sheet happens to print.
  2. Recalculate the volumetric ratio yourself from the weight ratio and the process-temperature densities, then compare your number with the one the supplier proposes.
  3. Record shot weights and cycle times across one full shift, then report the average hour and the peak hour separately.
  4. List every formulation you expect to run within two years, with its ratio spread, viscosity and filler load.
  5. Write down the cleaning method you will actually permit, including the solvent and how you dispose of the flush.
  6. Measure air pressure, water temperature and power quality at the machine location, not at the compressor room.
  7. Convert each bracket in the RFQ into a test you can run at acceptance, with a pass line.

a17

If two or three of these produce a blank page, the blank page is the part of the specification you were about to leave to the supplier. Filling it takes less time than correcting a machine that was sized around a missing density figure.

What to send before you ask for a quote

Send the material side and the plant side together: polymer family and formulation code, mix ratio with its basis and reference temperature, viscosity with method and shear rate, density at process temperature, NCO content or hydroxyl value, filler type and loading, cream and gel times, shot weight, shots per hour at average and peak, cycle time and mold count, changeover frequency, cleaning method, and your measured air and water conditions at the machine location.

With those fields in hand, a low-pressure PU machine can be sized against your process window rather than quoted as a range that happens to include it. To work through the sizing with Haifeng Polyurethane Machinery, write to info@haifeng-automation.cn or send the same list on WhatsApp at 86 13566296633.

FAQ

Which TDS value causes the most machine sizing errors?

Density at the wrong temperature, closely followed by viscosity quoted without its method. Density converts the weight ratio into the volume the pumps actually deliver, so an ambient figure used for material processed at 60 °C shifts the calculated ratio. Viscosity without a method cannot be compared with another supplier’s figure, because spindle and capillary methods return different numbers on shear-thinning material. Ask for both fields at process temperature with the test method named, and if the supplier cannot provide them, measure a sample on your own instrument with the temperature and method recorded.

Does a mix ratio given by volume remove the conversion problem?

It removes the arithmetic, not the risk. A volumetric ratio is valid at the temperature where the densities were taken, and it shifts if the material is heated or if filler is added. Confirm the reference temperature and whether the figure refers to the base resin or the filled mix. Ask also whether the ratio is nominal or carries a tolerance band. Without a band, you cannot tell whether a two-percent deviation at the pump sits inside the process window or outside it.

How precise should the SOP output figure be?

Precise enough to separate average from peak. Record shot weights and cycle times across a full shift, then report the average hour and the peak hour separately, along with the productive hours in that shift. A machine sized to the average cannot cover the peak, and a machine sized to the peak runs below capacity for most of the day. Both numbers are useful, while a round figure such as about 200 per hour is not. Note too whether the figure assumes a shift without color changes.

Can one low-pressure machine run several formulations?

Often yes, within limits the TDS will reveal. The constraints are ratio spread, viscosity range and filler load. A machine sized for 100 : 45 may not hold ratio at 100 : 8, because the small stream drops below the pump’s controllable minimum. A machine built for unfilled polyol will wear quickly on a hard-filled system. List every formulation you expect to run within two years, then check that the pump range and wetted materials cover the widest and the most abrasive of them, not only the first product.

What if the material supplier will not release a full TDS?

Ask for the specific fields instead of the whole document, and offer an NDA if confidentiality is the obstacle. Viscosity at process temperature, density at process temperature, ratio basis, NCO content or hydroxyl value and reactivity times are the minimum for sizing. If some remain unavailable, the machine supplier can only quote a range and the acceptance test cannot be written. A sample measured on your own equipment, with method and temperature recorded, is a workable substitute for a missing viscosity figure, but it cannot replace a missing ratio basis.

If you’re interested, check out these related articles:

How to Choose a Tire Foam Filling Machine
Roof and Wall Sandwich Panel Production Line: Machine Selection for Industrial Buildings
Tire Foam Filling Equipment Manufacturer China

Related Posts